Basements and crawl spaces cost the most, because they need extra digging and supports below the floor. A slab skips that work, so it starts from a lower budget, and when the lot suits it, it goes in quicker and easier too, which brings labor costs down considerably. That's a good part of why slabs are the most common foundation around Seattle and across much of the Pacific Northwest.
The catch is the ground. A slab works only where the lot is level throughout and the soil is well compacted, because the slab rests on that soil across its whole width and follows it if it settles. On a sloped or soft lot, another kind of foundation usually serves you better.
What moves the price is mostly the size of the slab, how much work the ground needs before it's ready and which barrier goes underneath. The schedule turns on that same site work and on whether your job needs a permit, and from which office. My written estimate sets out what's included, such as taking out any old concrete and cleaning up afterward, so you know what you're paying for before we start.